WMF Portugal home World Monuments Fund
WMF Europe
WMF France
WMF Britain
WMF Spain
As Obras da WMF-P WMF-P Works Projects WMF's World Monuments Watch News Press Room WMF-Portugal Friends
 

Tower of Belém

Work categories

The works were divided into four main categories:


- structural work;
- cleaning phases;
- treatment of the joints and surface repairs;
- other operations and treatments.


Structural Work

Initially, unstable fragments were collected and catalogued.

 

These components were afterwards put in place with epoxy resin and the cracks finished with the same rendering to match adjacent areas.

 

 

Large unstable components, which were out of place or broken, were realigned and structurally reinforced where necessary.

The works on the Archangel St. Michael in the NE corner involved a search of the sea bed around the Tower to find a part of the left wing that was broken and lost in 1994. After a few attempts the piece was recovered.

 

During the survey it was discovered that the sculpture was displaced relative to its base, and had become unstable. The piece was replaced in its correct position.

 

<previous                                                                                      next>