Tower of Belém
Cleaning phases
Deposits were found on the stonework surfaces which needed a
mixture of cleaning processes, such as wet and dry, chemical and
mechanical. The processes used depended on whether the need was
for conservation or aesthetics.
Treatment of the joints and surface repairs
The treatment of the joints consisted in removal of unnecessary
materials, partial filling of structural gaps and the final plastering
of the surfaces Ð around ten thousand metres of jointing were
repaired.
Other work
This includes various small jobs and the final treatment for
protection.
<previous
|